Electricity connections are priced on a zone basis depending on location. The price also depends on the distance to the nearest distribution substation, the capacity of the main fuse and the required connection capacity.

Enter the details in the price calculator to instantly discover the price and delivery time of an electricity connection located in zones 1–3 up to 500 A or in zone 4 up to 100 A.​

You will receive a quote for +500 A connections outside the zones or in zones 1–3 as well as +100 A connections in zone 4 within 10 working days from requesting a quote. If further information is required for the site, we will contact you to agree on a schedule for the quote. We will do the same with regard to quotes for high-voltage connections.​

Infografiikka, joka kuvaa sähköliittymien vyöhykehinnoittelua

The connection payment zone is based on the access place

Zone V1

Zone 1 includes, without restrictions, all connections in the street plan area regardless of the distance (does not apply to master plans, detailed shore plans or shore plans). In addition, zone 1 includes connections where the distance to the access place from an existing distribution substation is 0–200 m, even if the connections were located outside the street plan area.

Zone V2

An area other than a street plan area. The direct distance to the access place from an existing distribution substation is 200–400 m.

Zone V3

An area other than a street plan area. The direct distance to the access place from an existing distribution substation is 400–600 m.

Zone V4

An area other than a street plan area. The direct distance to the access place from an existing distribution substation is 600–1,000 m.